Monday, 3 November 2014

Futurism Risk Assessment


Assessment Reference:
Unit 3
Activity Description:
Taking photographs for Futurism shoot.
Date:
19.10.14
Student
Millie Brannan (Student)

Review Date:
20.10.14
Assessment Team Members:
Gemma breese
Overall Potential Risk Factor:
3 likely
Course Details:
90 Credit Diploma Photography




Number of People Exposed:
3


Names of People Exposed:
Millie,Megan,Evan
Building-Place & Exact Location
Hockney Building / Old building
Is This An Acceptable Risk?



Hazard
Persons At Risk and How
Existing Control Measures
What are you currently doing to prevent it?
Probability
Severity
Risk Level
Additional Control Measures
What else do you need to do?
Probability
Severity
Risk Level
Main stair case in the Old Building
Might miss a step and fall down the stairs.
Make sure people are careful when they are walking down and up the stairs.

1
1




Stairs in the new Building
Might trip up over there lace.
Make sure people have their laces tied.

2
1




Main reception of the Hockney Building.
Lots of people about could accidently knock camera out of your hands.
Make sure I am holding my camera securely and that nobody is going to bump into me.

3
1




No comments:

Post a Comment